Berliner FeuerwehrBerliner
Feuerwehr
Dashboard
All Buildings
All EventsLocations
All PersonsAccess Control
KRITIS-MonitorMegatrendsKlimadatenKaskadeneffekte
AppsAI Hub
Building PermitsFire Risk PredictionResilienceDocumentsAudit Log
All ReportsData ImportAPI Docs
General SettingsNotificationsTenants

Berliner Feuerwehr

Version 2.0.0

Resilience Management

Risk assessment and emergency preparedness

78%

Avg. Resilience Score

3

High/Critical Risks

4

Pending Measures

4

Assessed Buildings

Severe Flood Event

3 buildings affected

High

Major flooding due to extreme rainfall or river overflow affecting basement levels and ground floors.

Mitigation Progress3/4
Probability: PossibleNext assessment: 3/15/2026
Extended Power Outage

4 buildings affected

Medium

Grid failure lasting more than 4 hours affecting all building operations.

Mitigation Progress3/4
Probability: LikelyNext assessment: 4/1/2026
Cyber Security Breach

5 buildings affected

Critical

Ransomware attack or data breach targeting building management systems.

Mitigation Progress4/5
Probability: PossibleNext assessment: 2/1/2026
Extreme Heat Wave

4 buildings affected

Medium

Extended period of temperatures above 35°C affecting building climate and occupant health.

Mitigation Progress3/4
Probability: LikelyNext assessment: 4/15/2026
Fire Emergency

5 buildings affected

Critical

Major fire event requiring full building evacuation and emergency response.

Mitigation Progress5/5
Probability: UnlikelyNext assessment: 4/20/2026